Santana Construction Uganda has been the main Ugandan contractor in the construction of the Photovoltaic Soroti Solar Power Plant in Soroti.

CLIENT
ARCHITECTS
YEAR
2012
PROGRAM
STATUS
Done

Photovoltaic Soroti Solar Power Plant in Soroti

The power station will have a 10 megawatt capacity, which will be sold directly to the Uganda Electricity Transmission Company Limited for integration into the national electricity grid. The power will be evacuated via a substation near the station. It is estimated that the energy generated will power approximately 40,000 homes located near the station, thereby keeping transmission losses to a minimum.

Photovoltaic Soroti Solar Power Plant in Soroti

Santana Construction Uganda has been the main Ugandan contractor in the construction of the Photovoltaic Soroti Solar Power Plant in Soroti.

 

The power station will have a 10 megawatt capacity, which will be sold directly to the Uganda Electricity Transmission Company Limited for integration into the national electricity grid. The power will be evacuated via a substation near the station. It is estimated that the energy generated will power approximately 40,000 homes located near the station, thereby keeping transmission losses to a minimum.

 

Test

What we did?

Santana Construction Uganda has done the works for:

  • Civil Works. Drainage systems, fencing, cable trenches
  • Electrical and mechanical assembly of solar panels, metallic structure, inverters, transformers. More than 200 workers.
×